Owner: Hongya County Hongzhou Industrial Investment Co., Ltd.
Design Period: September 2026 – December 2026
Design Content: Construction drawing design
Project Content: A new 110 kV Jiangjun Yangchang Substation is to be built, and two 110 kV bays are to be added at the existing Tianjingkan 220 kV Substation through expansion. Meanwhile, an approximately 5.32 km 110 kV power line from Tianjingkan to Jiangjun Yangchang is to be constructed. One 110 kV Yangchang Substation: the substation capacity is 1×63 MVA in this phase and 2×63 MVA in the final phase; 110 kV incoming lines: 2 circuits in this phase and 4 circuits in the final phase; 35 kV outgoing lines: 3 circuits in this phase and 6 circuits in the final phase; 10 kV outgoing lines: 10 circuits in this phase and 20 circuits in the final phase; reactive power compensation: 2×5 MVar in this phase and 4×5 MVar in the final phase; 10 kV arc suppression coils and grounding transformers: 1×800 kVA in this phase and 2×800 kVA in the final phase (including station service transformer capacity of 200 kVA); arc suppression coil capacity: 630 kvar. Two 110 kV bays are added through expansion.
The 110 kV transmission line is approximately 5.32 km long, including: a double-circuit-on-same-tower overhead line with conductor type JL/G1A-400/35 and a length of 3.54 km; a single-circuit overhead line with a route length of 0.92 km; and a cable with type YJLW02-Z-64/110-1×1000 mm² single-core copper conductor and a length of 0.86 km.