Construction Period: August 2026 – November 2026
Project Overview: Using a cooperative rooftop area of 2,045 m², the project involves the procurement of N-type monocrystalline silicon bifacial 630Wp modules, one 80kW and one 60kW string inverter, and main equipment such as a 140kW-250A grid connection box, to build a distributed photovoltaic power generation project with a DC-side capacity of 171.36kWp and an AC-side capacity of 140kW. After completion, the average annual power generation in 2025 is expected to be 137,000 kWh. The power consumption mode is self-generation for self-use, with surplus power fed into the grid.