Client: State Grid Chongqing Electric Power Company
Design Year: 2024
Scope of Works: The 220 kV outgoing transmission works from the Fangdoushan 500 kV Substation in Chongqing (transmission line component) comprise the following six sub-projects:
(1) 220 kV line works for the π-type connection of the Fengbin North and South Lines into Fangdoushan Substation: new double-circuit overhead lines, route length 30 km;
(2) 220 kV line works from Fangdoushan Substation to Mingshan Switching Station: new double-circuit overhead lines, route length 12 km;
(3) 220 kV line works for the π-type connection of the Fengqian South Line into Mingshan Switching Station: new double-circuit overhead lines, route length 18 km;
(4) 220 kV line works from Long’an Substation to Dianjiang Traction Substation: new single-circuit overhead lines, route length 8 km;
(5) 220 kV line works from Changshou Substation to Fuling Substation: new double-circuit overhead lines, route length 34 km;
(6) 220 kV line reconnection works for the Fulong East and West Lines and the Zaofu North and South Lines: new lines, route length 0.1 km.
The 220 kV outgoing transmission works from the Fangdoushan 500 kV Substation (substation component) comprise the following five sub-projects:
(1) 220 kV bay extension works at Changshou 500 kV Substation: conversion of the 220 kV bus-section bay from AIS equipment to HGIS equipment;
(2) 220 kV bay extension works at Mingshan Switching Station: addition of four HGIS outgoing bays;
(3) 220 kV bay extension works at Long’an Substation: addition of one 220 kV outdoor GIS outgoing bay;
(4) 220 kV bay modification works at Nanbin Substation: modification of two outdoor GIS outgoing bays;
(5) 220 kV bay completion works at the opposite terminal of the 220 kV Fuling Substation: retrofit of the current transformers and associated conductors within the AIS bays.