Owner: Datang Jiangcheng New Energy Co., Ltd.
Design Period: December 2022
Total Project Investment: RMB 255.8488 million
Project Overview: The project is located on the northwest side and southeast slopes of Longma Village, Baozang Town, Jiangcheng Hani and Yi Autonomous County, Pu’er City, Yunnan Province. The site elevation ranges from 750 m to 1200 m. The project has an installed capacity of 60 MW (AC side) and a capacity of 72.29152MWp (DC side). It adopts 590Wp monocrystalline silicon bifacial N-type solar cell modules, with a total of 24 PV power generation units. A total of 122,528 modules are installed, along with 200 sets of 300kW string inverters. The power is collected through 35 kV collector lines to the self-built 110 kV step-up substation, and then transmitted via one newly built 110 kV overhead line to the 110 kV side of the Manpaliangzi PV 220 kV step-up substation.
The designed average annual power generation is 91,742.0 MWh, and the designed average annual utilization hours are 1,269.1 hours. The project started design in December 2024 and was successfully connected to the grid on May 31, 2025.