Owner: EHV Branch, State Grid Chongqing Electric Power Company
Design Period: June 2025
Project Content: Located in Chenjiaqiao Town, Shapingba District, Chongqing, the 500 kV Chenjiaqiao Substation covers an area of 159 mu and serves as a major corridor of the Sichuan-Chongqing power grid and an important node of Chongqing’s 500 kV “日”-shaped double-ring backbone grid, as well as a key power source support point for Shapingba District and Jiulongpo District in the main urban area of Chongqing. The project replaces the existing #2 main transformer with one of the same capacity, which will then operate in parallel with the #1 and #3 main transformers, with a total capacity of 2250 MVA.