Project Overview: The project is located within the Gree factory area on Gree Road, Jiulongpo District, Chongqing. The planned DC-side installed capacity is 6.55188 MWp, and the AC-side installed capacity is 5.93MW, equipped with a 2.83MW/5.66MWh energy storage system. The average power generation in 2025 is 5.2277 million kWh, and the average equivalent utilization hours in 2025 are 797.89 hours. It can reduce electricity costs for the factory by approximately RMB 3.13 million per year. Through precise analysis of the project’s solar energy resources using drones and professional PV analysis software, the site is utilized to the maximum extent, providing the owner with the optimal design solution.