Owner: Tianshengqiao Bureau, EHV Power Transmission Company, China Southern Power Grid Co., Ltd.
Design Period: 2025
Project Content: The project starts from Tower No. 1 of the 500 kV Tianshengqiao-Jinzhou Line and ends at the 500 kV Jinzhou Substation, with a total route length of 20.443 km and 41 towers. To increase transmission capacity, the conductor type of the 20.443 km single-circuit line of the 500 kV Tianshengqiao–Jinzhou Line is changed from LGJ-300/40 steel-cored aluminum stranded wire to JNRLH1/LB20A-300/40 aluminum-clad steel-cored heat-resistant aluminum alloy stranded wire, with 13 new towers built.