220 kV Substation Project for the High-Performance Wide Alloy Plate and Strip Production Line

Owner: Southwest Aluminum (Group) Co., Ltd.

Design Period: 2025–present

Design Content: Preliminary design, construction drawings, as-built drawings

Project Content: This project involves the construction of a new 220 kV substation. The main transformer configuration is ultimately 3×120 MVA, with 2×120 MVA in this phase. The transformers are on-load tap-changing transformers with a voltage level of 220/110/10 kV and a capacity of 120/120/80 MVA.