220 kV Qihuang Line and 220 kV Longtie Line Relocation and Modification for the Yu-Qian Back-to-Back Interconnection Project

Owner: Southwest Branch, State Grid Corporation of China

Design Period: 2025

Project Content:

Qihuang Line Relocation and Modification: 14 newly built towers and a newly built single-circuit route length of 5.2 km. The conductor type is 2×JL/G1A-300/40 steel-cored aluminum stranded wire, and the ground wire is LJB20A-120 aluminum-clad steel stranded wire.

Longtie Line Relocation and Modification: 4 newly built towers and a newly built line length of 0.646 km. The conductor is 1×JL/G1A-400/35 steel-cored aluminum stranded wire; the ground wires consist of one JLB40A-150 ordinary ground wire and one OPGW-24B1-150 optical cable.