Owner: Youyang Power Supply Branch, State Grid Chongqing Electric Power Company
Design Period: 2023
Design Content: Feasibility study, preliminary design, construction drawings
Project Overview: New construction and modification of 45 km of 10 kV lines, new construction of 25 km of 0.4 kV lines, installation of 35 new distribution transformers.