Owner: China Resources New Energy Photovoltaic Power Generation (Dechang) Co., Ltd.
Design Period: 2024
Project Overview: The AC-side nominal capacity of the power station is 220 MW, and the DC-side installed capacity is 267.58704 MWp. The project includes a supporting 220 kV step-up substation and one 22 MW/44 MWh energy storage station.

