China Resources New Energy Xichang Youjun 230 MW Photovoltaic Power Generation Project

Owner: China Resources New Energy (Xichang) Co., Ltd.

Design Period: 2024

Design Content: Preliminary design, construction drawings

Project Overview: The PV site covers a total area of approximately 2,802.58 mu. The project has a planned nominal capacity of 230 MW and a DC-side installed capacity of approximately 288.20792 MWp. It is connected to the self-built 220 kV step-up substation of this phase through 9 collector lines. One new 220 kV line is planned to the Zhangmu 220 kV Substation, along with one supporting 23 MW/46 MWh energy storage station. The average annual power generation of the PV power station in 2025 is approximately 399.80353 million kWh, and the average annual utilization hours in 2025 are 1,377.1 hours.