Owner: Wushan Power Supply Branch, State Grid Chongqing Electric Power Company
Design Period: 2022
Design Content: Feasibility study, preliminary design, construction drawings
Project Overview: New construction and modification of 20.9 km of 10 kV lines, new construction of 69.4 km of 0.4 kV lines, installation of 49 new transformers.

