Owner: State Grid Chongqing EHV Company
Design Period: 2023
Design Content: Feasibility study, preliminary design, construction drawings
Project Overview: Three guyed towers (#022, #029, #034) on the 500 kV Sichang I Line are modified, with their foundations standardized and improved. #022 and #034 are tension towers, and #029 is converted into a suspension tower.

