Owner: EHV Power Transmission Company Dali Bureau
Design Period: June 2025
Project Content: The project adds two sets of compressed air foam fire extinguishing systems, including two buffer water tanks, two foam liquid tanks, four CAFS prefabricated cabins, two monitor valve cabins, and 28 fixed fire monitors. The pipelines use DN150 and DN125 seamless steel pipes.

