Owner: Xizang Pioneer Green Energy Environmental Protection Technology Co., Ltd.
Design Period: 2022
Design Content: Feasibility study, preliminary design, construction drawings, and as-built drawings
Project Overview: The 110 kV overhead line section runs from the 220 kV Longxingbei Substation to the 110 kV Tongluoxia Substation, with a newly built single-circuit overhead line route length of approximately 9.5 km; the 110 kV cable section consists of a newly built “Longxingbei Substation–Tongluoxia Substation” cable route length of approximately 1.88 km; for the T-connection to the 10 kV Yangwu Line dedicated 10 kV line section, a newly built overhead line of 2.9 km and a newly built cable length of approximately 0.28 km are included; for the optical cable section, two 24-core OPGW composite optical cables are installed along the newly built “Longxingbei Substation–Tongluoxia Substation” 110 kV overhead line, with a route length of approximately 2 km.